I have come a long way in the shack remodel. I have been working on this for quite a while and am very glade I put the work into it. It is not complete, but when are you ever done. I will continue to tweak it. I have been using it for several weeks now and I like the setup. These pictures are of the main operating desk. I have another desk that can be a secondary operating position or repair station. I will post some other views and of the battery room later. I have run the station on the batteries for a short duration test with very good results!
Current equipment list for station one:
FT-767GX Yaesu HF
MFJ-989B Versa Tunner V
IC-2000 Icom 2m
PRO-49 Scanner
Dell Precision 490
Compaq Presario not shown
TYT UVF1 2m/440 Handheld
7" LCD TV for local over the air stations
24" LED TV for cable
No comments:
Post a Comment